// GA code (function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.data-privacy-src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','https://www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-109815535-1', 'auto', {'siteSpeedSampleRate': 100}); ga('set', 'forceSSL', true); ga('set', 'anonymizeIp', true); ga('send', 'pageview');

DA-EC3101T

Ethernet over Coax (EoC) Transceiver

ㆍMakes it possible to install Full HD network cameras using existing coaxial cables
ㆍSupports PoE (IEEE 802.3af, IEEE 802.3at)
ㆍSupports plug and play without setting up special IP addresses
ㆍSupports Data transfer up to 600m

🔎    Vergelijk product

Description

RJ-45 Ethernet Interface
Connectivity RJ-45, Auto-MDI/MDI-X sensing
Wire Type CAT5 or better
Distance Up to 100m
Speed 10/100 Base-T, half/full duplex
Speed Data Throughput 95Mbps
Coax Building Wiring Interface
Connectivity BNC
Impedance 75 Ω
Distance Up to 500m
Camera Power In Up to 30W
GENERAL
Unit Dimensions (W x H x D) 61.6mm x 24mm x 94mm
Unit Weight 105g
Operation Temperature -20°C ~ 60°C (-4°F ~ 140°F)
Power Input DC56V / 1.17A
Power Consumption 65.52W
Approvals FCC, CE, KC

Downloads

Manual NL EN FR
Operation Manual
Datasheet NL EN FR
Version 7.0
BIM
Building Information Model

Dimensions

Information request

    On behalf of the entire IDIS team, we would like to thank you for the past year and wish you happy holidays and a safe New Year.

    PLEASE NOTE: We are closed between Christmas and New Year.
    Therefore, place your orders in time to ensure that they are delivered before the holidays. We will resume our activities from Thursday 2 January.On behalf of the entire IDIS team, we would like to thank you for the past year and wish you happy holidays and a safe New Year.

    PLEASE NOTE: We are closed between Christmas and New Year.
    Therefore, place your orders in time to ensure that they are delivered before the holidays. We will resume our activities from Thursday 2 January.